9th floor – City Tower

Category: Commercial, Offices

Duration: 10 weeks

Project Brief

Project Brief – Full strip out, design and build refurbishment package of commercial building within City Tower Manchester.
This project consisted of stage 4 designs for electrical, fire alarm and network cabling installations throughout the building.
H&O worked alongside Inside Limited to deliver this project within a challenging time frame. Further work packages have also been instructed since handover which is a credit to the team involved in delivering this project.

Packages delivered:

  • Stage 4 Electrical Design 
  • Electrical Installations
  • Full Electrical containment system
  • Lighting and Emergency lighting Installation 
  • Small Power Installation 
  • Fire Alarm Installation
  • Network Cabling 
  • Fire damper control wiring