Project Brief

Redevelopment of existing underpass area and refurbishment of existing dining / catering rooms within the school. This project was undertaken and delivered within a specific timeframe to meet the school requirements. H&O worked alongside Redbridge Interiors to develop the design, deliver electrical / security / network cabling packages and coordinate all requirements in connection with the catering package. The project was completed in 10 weeks to fall within the school summer holiday period.

Packages delivered:

  • Stage 4 Electrical Design
  • Electrical Installations
  • Network Cabling
  • Door Access Installations
  • External Lighting Scheme