Home

About

Services

Projects

Contact

Commercial, Offices

Fontwell House – Wain Homes

Retain newly refurbished CAT A installations across 2 floors and adapt / enhance to suit the client fit out requirements. Contract design responsibility for electrical packages from stage 2 through to stage 4. H&O worked alongside TJM Projects to develop the design from initial concept through to stage 4. We delivered full packages for electrical / fire alarm / security / network cabling whilst assisting the client with new intelligent external EV chargers within the car park. The project was completed in 14 weeks including an early handover of the client’s comms room.

Commercial, Offices

9th floor – City Tower

Full strip out, design and build refurbishment package of commercial building within City Tower Manchester.
This project consisted of stage 4 designs for electrical, fire alarm and network cabling installations throughout the building.
H&O worked alongside Inside Limited to deliver this project within a challenging time frame. Further work packages have also been instructed since handover which is a credit to the team involved in delivering this project.

Commercial, Offices

Maritime Shipping, Euro Terminal

Full design and build refurbishment package of existing double storey commercial building within existing Maritime Shipping operational site.
This project consisted of stage 4 designs for electrical, fire alarm and network cabling installations throughout the building.
H&O worked alongside Inside Limited to deliver this project within a challenging time frame. Further work packages have also been instructed since handover which is a credit to the team involved in delivering this project.